all
product-image

This is the main operational/production equipment for loading and unloading jobs into various tanks in the chemical process, with a programmed cycle. The cycle is based on timings required in... Read More

MOQ
1 No
PACKAGING
2 % of basic cost
HS Code
Cas No.
Documents:
-NA-

Are you sure you want to

×
product-image

According to PCB (Pollution Control Board), direct exhaust of powder to atmosphere via cyclone is harmful to human and to the environment. Hence, AFU (After Filter Unit) is suggested for... Read More

MOQ
1 No
PACKAGING
2 % of basic cost
HS Code
Cas No.
Documents:
-NA-

Are you sure you want to

×
product-image

The booth consists of MS/SS panel enclosure. Constant flow, water wall is provided at the back side of the article. While spray painting, the overspread paint flows downward with water.... Read More

MOQ
1 No
PACKAGING
2 % of basic cost
HS Code
Cas No.
Documents:
-NA-

Are you sure you want to

×
product-image

Fabricated enclosure of MS or SS is provided to spray powder through electro static gun on Article.The encloser is provided with powder Recovery systems ( monocyclone / multi-cyclone. )

MOQ
1 No
PACKAGING
2 % of basic cost
HS Code
Cas No.
Documents:
-NA-

Are you sure you want to

×
product-image

The conveyor carries the article inside the tunnel. The tunnel is provided with different zones as per required chemical process. The spray density & pressure is controlled with the help of pumps... Read More

MOQ
1 No
PACKAGING
2 % of basic cost
HS Code
Cas No.
Documents:
-NA-

Are you sure you want to

×
product-image

The enclosed insulated chamber is provided with air circulating blowers & heating system. The air is circulated in the chamber to increase & distribute even temperature in all over area.

MOQ
1 No
PACKAGING
2 % of Basic cost
HS Code
Cas No.
Documents:
-NA-

Are you sure you want to

×
product-image

The articles are loaded in a basket / jig. The basket/jig is lifted & dipped in various tanks as per required chemical process. The lifting & dipping of basket can be done... Read More

MOQ
1 No
PACKAGING
2 % of basic cost
HS Code
Cas No.
Documents:
-NA-

Are you sure you want to

×